More 5/8-minus gravel, please

by Chuck April 19, 2009

This week we started working on our new deck and patio in earnest. We've always planned a deck on the side of the house off the dining room, we just couldn't afford to put one in after building the house. Instead, we put a gravel pad on the side of the house where we wanted the patio to go.

On Wednesday I used the tractor, a rake and a shovel to remove the gravel from the pad. On Saturday we started digging out the dirt to put the gravel base in for the patio section. 

I guess I should explain a little. We're putting in a 20x20 deck, but the 8x8 northwest corner is going to be a flagstone patio instead of a deck. Dana saw something like it on DIY Network, so we're using the idea. After we get the patio section in, we'll put the deck over the top of the inside corner with a step down to the patio. Our firepit will go on the patio so we don't inadvertantly burn the house down.

Anyway, we dug out the corner, piling the dirt up over by the compost bins, then backfilled with the gravel from the rest of the pad. When that ran out we went to Rockman here in town to get a pickup-load of gravel. Everything looked great, we went out and bought sand and edging and even a couple of rubber hammers to pound the stones with to settle them.

On Sunday we found the a stone that we liked at a place in Clearview off Highway 9. It's a stone that they call "Cowboy Coffee," but that's a color name, I'm not sure what the actual stone type is. Probably a Kentucky bluestone, it looks like that to me.  Anyway, we bought jsut over a ton. Then loaded it into the truck and hauled it home. Then unloaded it. That was about it for our Sunday.

And then I realized I wanted to put a curve on the outside edge. 

The edging helped me make a nice fair curve, but it meant we needed to do some more digging.